|

A New Approach to Mathematical Simulation of Sheduling at an Industrial Plant

Authors: Savenkova N.P.,, Laponin V.S., Mokin A.Yu., Artemieva L.A., Dryazhenkov A.A. Published: 02.07.2021
Published in issue: #2(135)/2021  
DOI: 10.18698/0236-3933-2021-2-103-114

 
Category: Informatics, Computer Engineering and Control | Chapter: Mathematical Modelling, Numerical Methods, and Program Complexes  
Keywords: mathematical simulation, scheduling, consolidation of material balances, management problem, numerical solution

The purpose of this work was to build a model of industrial plant management and develop a schedule plan based on it. The paper considers a controlled model of product flows at an industrial enterprise. The model describes the interaction between various objects at the enterprise: production plants, manifolds, overpasses, piers, transport. In addition, the model specifies the composition and proportions of the components of raw materials and additives for each type of manufactured product, as well as physical constraints on the objects involvedin the production process. This brings us to the model of both the quality functional and equality and inequality constraints in the mathematical formulation. After building the model, the original control problem was reduced to two problems: direct and inverse. The numerical solution of both is provided in a close relationship between them. The study uses the findings from the theory of mathematical modeling, linear algebra and optimization theory, and leads to the development of the technique of building models of scheduling at an enterprise and numerical methods for solving the corresponding management problems. The research results are of great practical importance and can be used for effective management of the production process in many industries

References

[1] Artem’yev S.B., Borodin P.E., Zakiev A.R., et al. Automation of material balance agreement process at an oil refinery. Avtomatizatsiya v promyshlennosti [Automation and Remote Control], 2014, no. 8, pp. 22--28 (in Russ.).

[2] Kuvykin V.I., Kuvykina E.V., Matveev A.E., et al. Improving the efficiency of production with mass balance reconciliation system. Sovremennye naukoemkie tekhnologii [Modern High Technologies], 2019, no. 4, pp. 36--40 (in Russ.). Available at: https://top-technologies.ru/ru/article/view?id=37488

[3] Prokazina M.V., Khokhlov A.S., Shaydullin R.A. Simulation models in oil refinery scheduling system. Avtomatizatsiya v promyshlennosti [Automation and Remote Control], 2012, no. 10, pp. 15--21 (in Russ.).

[4] Antipin A.S. Extrapolational methods for calculation of a saddle point of Lagrange function and their application to problems with separable block structure. USSR Comput. Math. Math. Phys., 1986, vol. 26, no. 1, p. 96. DOI: https://doi.org/10.1016/0041-5553(86)90189-8

[5] Akulenko L.D. Asimptoticheskie metody optimal’nogo upravleniya [Asymptotic methods of optimal control]. Moscow, Nauka Publ., 1987.

[6] Alekseev V.M., Tikhomirov V.M., Fomin S.V. Optimal’noe upravlenie [Optimum control]. Moscow, FIZMATLIT Publ., 2007.

[7] Banichuk N.V. Vvedenie v optimizatsiyu konstruktsiy [Introduction to optimization of structures]. Moscow, Nauka Publ., 1986.

[8] Conway R.W., Maxwell W.L., Miller L.W. Theory of Scheduling. Boston, Adisson Wesley, 1967.

[9] Krasovskiy N.N., Tret’yakov V.E. Zadachi upravleniya s garantirovannym rezul’tatom [Management problems with guaranteed results]. Sverdlovsk, Sredne-Ural’skoe knizhnoe izd-vo Publ., 1986.

[10] Savenkova N.P., Artem’yeva L.A., Dryazhenkov A.A., et al. [Mathematical model of distribution of production flows]. XXV Mezhdunar. konf. "Matematika. Komp’yuter. Obrazovanie". T. 25 [XXV Int. Conf. "Mathematics. Computer. Education". Vol. 25]. Moscow, Izhevsk, RKhCh Publ., 2018, p. 216 (in Russ.).

[11] Savenkova N.P., Artem’yeva L.A., Laponin V.S., et al. Mathematical modeling of material balance data. Neftegaz.RU, 2018, no. 4, p. 91 (in Russ.).

[12] Savenkova N.P., Ilyutko V.P., Artem’yeva L.A., et al. [On the problem of calendar planning in an industrial plant]. Mezhdunar. nauch. konf. "Sovremennye problemy vychislitelʼnoy matematiki i matematicheskoy fiziki" [Int. Sc. Conf. "Modern Problems of Computational Mathematics and Mathematical Physics"]. Moscow, Maks Press Publ., 2019, p. 23 (in Russ.).

[13] Savenkova N.P., Laponin V.S., Mokin A.Yu., et al. [Mathematical modeling of production flows in technological processes with a fixed production recipe]. Lomonosovskie chteniya 2018. Tez. dokl. [Lomonosov Readings 2018. Abs.]. Moscow, Maks Press Publ., 2018, pp. 106--107 (in Russ.).

[14] Savenkova N.P., Laponin V.S., Mokin A.Yu., et al. [Application of mathematical modeling apparatus in industrial production in order to implement the import substitution program]. Tikhonovskie chteniya. Nauch. konf. Tez. dokl. [Tikhonov Readings. Abs. Sc. Conf.]. Moscow, Maks Press Publ., 2019, p. 19 (in Russ.).

[15] Chernous’ko F.L., Banichuk N.V. Variatsionnye zadachi mekhaniki i upravleniya [Variational problems of mechanics and control]. Moscow, Nauka Publ., 1973.

[16] Smirnov A. Volumetric scheduling --- a basis of operational planning. Vestnik Sankt-Peterburgskogo Universiteta. Prikladnaya matematika. Informatika. Protsessy upravleniya [Vestnik of Saint Petersburg University. Applied Mathematics. Computer Science. Control Processes], 2005, no. 1-2, pp. 161--170 (in Russ.).